05/04/2024
Spread the love

US 701 at Colly Creek was repaired and is open.  Mercer Mill will open tomorrow by lunch and a US 701 detour will be established.  We hope to have NC 41 at Colly Creek repaired and opened by the end of the day tomorrow.  We will continue to stabilize locations as water levels fall.

READ MORE Road update for Bladen County from NC DOT Oct. 11th

 

About Author